Home ProductsTransformer Testing Equipment

18 Seconds Turn Ratio Transformer Testing Equipment

China Wuhan Rising Electric Co., Ltd. certification
China Wuhan Rising Electric Co., Ltd. certification
I bought a transformer test bench this January.It is really very good quality,runs very stable.

—— Mahmoud

I am lucky that I did select RISING's Relay Tester.

—— Mr.Abdul

Considering for a long time then ordered a TTR from RISING.It is cool.Good quality,advanced,smart and nice appearance

—— Mr.Shazab

I'm Online Chat Now

18 Seconds Turn Ratio Transformer Testing Equipment

18 Seconds Turn Ratio Transformer Testing Equipment
18 Seconds Turn Ratio Transformer Testing Equipment

Large Image :  18 Seconds Turn Ratio Transformer Testing Equipment

Product Details:
Place of Origin: China
Brand Name: RISING
Certification: ISO CE
Model Number: RSBC
Payment & Shipping Terms:
Minimum Order Quantity: 1 SET
Packaging Details: Wooden package
Payment Terms: L/C, L/C, D/A, D/P, T/T, Western Union, MoneyGram
Supply Ability: 500 SET PER Month
Detailed Product Description
Test Range: 0.9~10000 Resolution: Min 0.0001
Working Power: AC220V±10% 50±1Hz Ambient Temperature: -10℃~40℃
Warrenty: 1 Year Weight: 12kg
High Light:

18S TTR Test Equipment

,

0.9 turn ratio meter

RSBC Portable Transformer Turn Ratio Meter Turns Ratio TTR Test Equipment

Product Description

Transformer Ratio Tester is specially designed for three-phase transformer in power system, especially for transformer of type Z winding and other transformers whose zero-load current is relatively high. The tester has wide testing range, fast testing speed, favorable repeatability, flexible data processing, convenient connection, complete protection, easy learning and convenient operation.

 

Technical Parameters
1.Applicable to transformers connected in Z type.
2.Two output voltages are optional and applicable to transformer whose zero-load current is relatively high.
3.Have wide testing range and the highest transformation ratio may reach 10000.
4.Automatically calculate tap position.
5.Fast speed, which is only 18 seconds for three-phase.
6.Favorable repeatability.
7.Automatically save 99 data at most.
8.Flexible data processing, including retrieval, print, transfer to U-disk, delete and upload to PC computer for testing.
9.Have transformer short-circuit protection and interturn short-circuit protection functions. In case of short circuit, relevant information will be displayed on the LCD screen in characters.
10.The upper computer could control the whole testing process, save data.

Contact Details
Wuhan Rising Electric Co., Ltd.

Contact Person: Jason

Tel: +8613036102793

Send your inquiry directly to us (0 / 3000)